Côte d’Ivoire hosts approximately
30% of West Africa’s Birimian
greenstone belts, yet contributes
less than 15% of regional gold
production.
Projects are surrounded by major
deposits and mines, including
Tongon (4.9 Moz), Syama (6.1 Moz)
and Sissingué (1.4 Moz).
An initial 13,000 m AC, RC and diamond drilling campaign planned at Sirasso, alongside 15,000 m of auger drilling and 5,000 m of RC drilling at Tengrela.
Led by a former Randgold chief
geologist with 20 years of
Birimian experience.