Overview
399 km² between two operating mines, with early-stage exploration underway. Initial 2026 trenching at Fetiko returned 6.6 m @ 1.16 g/t gold, with a 15,000 m auger drilling program initiated in June 2026.
- Positioned along the Mahale–Sissengue shear zone in the Boundiali Greenstone Belt, a regional structure associated with multiple gold discoveries.
- Proximal to nearby producing mines: Syama 6.1 Moz, Sissengue 1.4 Moz, and Tabakoroni 1.35 Moz
- Historical surface sampling and geophysical mapping identified two structural corridors, confirmed by gold in soil geochemical anomalies
- Historical Exploration: 1958 geochemical soil samples, 2 Trenches, Regional Magnetic interpretation
Neighbours
Key Location
High potential, mining friendly jurisdiction with a stable government and supportive
infrastructure.
Positioned along the Mahale–Sissengue shear zone in the Boundiali Greenstone Belt, a regional structure associated with multiple gold discoveries.
Proximal to nearby producing mines
- Syama 6.1 Moz
- Sissengue 1.4 Moz
- Tabakoroni 1.35 Moz
Untested Prospect
Historical Exploration:
- 1958 geochemical soil samples
- 2 Trenches
- Regional Magnetic interpretation
Historical surface sampling and geophysical mapping identified two structural corridors, confirmed by gold in soil geochemical anomalies
Tengrela Fetiko Target
2026 Work Program
Initial trenches were completed in May 2026 on the Fetiko and Meiko targets.
6.6 m @ 1.16 g/t intercepted at the Fetiko target.
15,000 meter auger drilling program initiated in June
2026.
Meiko and Fetiko targets initially targeted, Iribasso
target planned.
Program has been paused until the completion of the rainy season and will continue following the cessation.
- Initial results are very positive at the Fetiko target where a 1.9 km by up to 500 m wide gold in
saprolite anomaly has been identified coincident with the main structural corridor. - Auger drilling will continue testing this target corridor along strike following the rainy season.
- A drilling decision will be made following completion of the program.
Project
Completion of 15,000 m auger drilling program
High resolution UAV magnetic survey over the project area
Lithostructural interpretation and targeting exercise.
Proposed program will continue to test strike continuity of the Syama structure splays and identify targets at intersections
- 15,000m of Auger drilling
- 2,000m of trenching
- 5,000m of RC drilling
- Metasedimentary, volcaniclastic and felsic porphyry host rocks have been confirmed through project
area are ideal for orogenic-style gold mineralization. - Major regional NE and NW trending structural corridors linking Syama and Sissingue deposits are
mapped with on the ground and with magnetic geophysics. - Rheological contrast between lithologies and pressure shadows around intrusive lithologies are
prime deposition sites for orogenic gold deposits.